Earlier this week (or was it last week), they put in the forms and poured the concrete foundation. This week they framed the first floor. I'm guessing there will be a second floor.
TrackBack
TrackBack URL for this entry: http://www.typepad.com/services/trackback/6a00d834515cf969e20133f28bdfcf970b
Earlier this week (or was it last week), they put in the forms and poured the concrete foundation. This week they framed the first floor. I'm guessing there will be a second floor.